CITY OF INDIANAPOLIS STREET CLOSINGS AND TRAFFIC RESTRICTIONS
August 30, 2010
NEW OR UPDATED RESTRICTIONS
(INDOT Projects)
***Asterisks indicate new or updated information***
I-465 Westside Traffic Pattern Changes to Take Effect Friday
New temporary express lane will be in northbound and southbound lanes
INDIANAPOLIS – Prior to the morning rush hour on Friday, August 27, the Indiana Department of Transportation (INDOT) anticipates shifting traffic to a new pattern on I-465 on the city’s west side. This new traffic pattern includes a temporary inside/left northbound 4.5 mile express lane, an innovative tool to minimize impact on this heavily traveled corridor between the Sam Jones Expressway and I-74/Crawfordsville Road.
Before traffic can be shifted, contractors will be striping the new lanes overnight Wednesday, August 25. Barrels will be in place to guide motorists. Crews will also be working Thursday to Saturday to move a concrete barrier wall in this work zone. Motorists in the express lane will not have access to U.S. 40/Washington Street, U.S. 36/Rockville Road and 10th Street. Traffic entering I-465 northbound from these interchanges and the entrance ramp from westbound Sam Jones Expressway to northbound I-465 will not have access to the express lane. The next available exit traveling northbound will be I-74/Crawfordsville Road.
Additionally, a temporary southbound express lane is anticipated to be in place by September 3. Crews will work a few days prior to this date to prepare for this traffic lane shift. Overnight lane closures and slow moving traffic are to be expected. Like the northbound express lane, motorists will not have access to U.S. 40/Washington Street, U.S. 36/Rockville Road and 10th Street, nor Sam Jones Expressway and I-70 east. The next available exit traveling southbound will be S.R. 67.
Large trucks will not be allowed in the express lanes. Both the northbound and southbound express lanes are expected to be in place through mid-October.
Gov. Mitch Daniels’ Major Moves highway program capitalizes on Indiana’s strategic location at the Crossroads of America by building a superior road infrastructure. This innovative plan is bringing jobs to the Hoosier State and is leaving a legacy for Indiana to be a global leader in distribution and logistics.
Additional information about this Major Moves project can be found at www.accelerate465.in.gov.
INDIANAPOLIS RESTRICTIONS UPDATE
INDIANAPOLIS – The following restrictions and road closures are current or upcoming for the Indianapolis metropolitan area. Many restrictions listed below are dependent upon favorable weather conditions and other factors.
NEW/UPDATED RESTRICTIONS
• I-465 southbound ramp to I-74 westbound will be closed as sign work occurs. Detour follows I-465 southbound to 10th Street to I-465 northbound to I-74.
Date: Monday, August 30, 2010
Time: 9 p.m. to 6 a.m.
ACCELERATE 465 RESTRICTIONS
• I-70 westbound ramp to I-465 southbound will be closed while interchange reconfiguration work occurs. Detour follows I-70 to Sam Jones Expressway to I-465 southbound.
Date: Wednesday, April 28 – November 2010
Time: Continuous
• I-70 westbound ramp to I-465 northbound will be closed while interchange reconfiguration work occurs. Detour
follows I-70 to Sam Jones Expressway to I-465 northbound.
Date: Friday, April 9 – Fall 2010
Time: Continuous
• I-465 loop ramps at U.S. 40/West Washington Street will be closed to allow contractors to shift I-465 toward the
center median. The traffic pattern will operate like a diamond interchange, with traffic signals on either end of the I-
465 bridge.
Date: Saturday, April 25, 2009 – Fall 2010
Time: Continuous
• I-465 between Sam Jones Expressway and I-74 on the west side will be shifted towards the shoulder as pavement work
begins on inside lanes. Three lanes will remain open during rush hours. Overnight and on weekends, up to two lanes
may close in each direction for road construction. Total intermittent closures may happen for 20 minutes at a time near
bridges to remove beams over I-465. Stay alert for changing traffic patterns.
Date: Monday, April 20, 2009 – Fall 2010
Time: 9 p.m. – 6 a.m. each night, continuous on weekends
• I-465 southbound ramp to I-70 eastbound will be closed while interchange reconfiguration work occurs. Detour follows I-465 to Sam Jones Expressway to I-70 eastbound.
Date: Monday, April 26 – November 2010
Time: Continuous
• I-465 southbound ramp to Crawfordsville Road eastbound will be closed for construction of a new flyover
ramp.
Date: Monday, June 7 at 5 a.m. – May 2011
Time: Continuous
• Sam Jones Expressway, in both directions between High School Road and Lyndhurst Drive, may be restricted to one lane of traffic for I-465 interchange construction.
Date: Monday, June 7 – August 2010
Time: Continuous
• West 10th Street will be restricted to two narrow lanes in each direction while contractors rebuild the bridge in two phases.
Date: Friday, March 13, 2009 – Fall 2010
Time: Continuous
465/69 NORTHEAST RESTRICTIONS
• I-465 between U.S. 31/Meridian Street and Allisonville Road on the north side will be shifted towards the outside lanes as work happens in the median. Three lanes will remain open during rush hours. Overnight and on weekends, up to two lanes may close in each direction for road construction. Total intermittent closures may happen for 20 minutes at a time near bridges to remove or replace beams over I-465. Stay alert for changing traffic patterns.
Date: Saturday, November 21 – December 2010
Time: 9 p.m. – 6 a.m. each night, continuous on weekends
• Keystone Avenue at I-465 will have narrow lanes and slight traffic shifts as construction work is completed in the area.
Date: Monday, January 15 – Fall 2010
Time: Continuous
PREVIOUSLY REPORTED RESTRICTIONS
• German Church Road at the intersection south of U.S. 40/Washington Street on the city’s east side will be closed as work continues to widen and rebuild the intersection. German Church Road north of U.S. 40/Washington Street will remain open. Detour is through Mitthoeffer Road or Prospect Road.
Date: Friday, July 30 – August 2010
Time: Continuous
• I-65 between I-865 and County Road 100 East in Boone County may have overnight or weekend restrictions while travel lanes are added. Further restrictions may occur as the project progresses.
Date: March 15, 2010 – Summer 2011
Time: Continuous
• I-70 near C.R. 600 West/Mt. Comfort Road in Hancock County will be restricted to one lane in each direction as barrier wall work occurs.
Date: Monday, August 23 – Friday, August 27, 2010
Time: 9 p.m. to 6 a.m. each day
• I-70 near Mt. Comfort Road may be restricted to one lane in either direction overnight for interchange reconstruction.
Date: Monday, April 6, 2009 – Fall 2010
Time: 9 p.m. – 6 a.m.
• I-465 at U.S. 31/East Street may experience overnight and weekend lane closures while the U.S. 31/East Street bridge overhead is demolished and reconstructed. Total night time intermittent closures may happen for 20 minutes at a time to remove beams over I-465.
Date: Tuesday, March 9 – Fall 2010
Time: 9 p.m. – 6 a.m. each night, continuous on weekends
• I-465 westbound ramp to U.S. 31/East Street southbound on the south side will be closed while the bridge is demolished and reconstructed in two phases. Detour follows I-465 westbound to Mann Road and loops around to I-465 eastbound.
Date: Tuesday, March 9 – Fall 2010
Time: Continuous
• I-465 eastbound ramp to U.S. 31/East Street northbound on the south side will be closed while the bridge is demolished and reconstructed in two phases. Detour follows I-465 eastbound to Emerson and loops around to I-465 westbound.
Date: Tuesday, March 9 – Fall 2010
Time: Continuous
• U.S 31/East Street between Epler Ave. and Edgewood Ave., existing southbound lanes will be closed. A crossover
is in place to move the southbound traffic in the existing widened northbound lanes. Two 11-foot lanes for
northbound and two 11-foot lanes for southbound traffic will be available. It is recommended that wide loads do not travel through this area.
Date: Tuesday, May 18, 2010 – Fall 2010
Time: Continuous
• U.S 31/East Street in both directions between Edgewood and Epler Avenues will have the left lane closed while the
Little Buck Creek bridge is demolished and reconstructed. Two through lanes remain open in each direction with a 35 mph speed limit in place. Stay alert for changing traffic patterns.
Date: Monday, April 5 – Fall 2010
Time: Continuous
• U.S. 31/East Street between Thompson Road and Mill Street will be restricted using a movable barrier wall while
the bridge over I-465 is demolished and reconstructed. During morning rush hour, there will be two lanes northbound
and one lane southbound. In the evening, there will be two lanes southbound and one lane northbound. Additional lane
restrictions may occur overnight and on weekends. Stay alert for changing traffic patterns.
Date: Tuesday, March 9 – Fall 2010
Time: Continuous
• U.S. 40/East Washington Street from German Church Road to the eastern edge of Cumberland is restricted to one
lane in each direction due to road reconstruction.
Date: Friday, April 3, 2009 – Fall 2010
Time: Continuous
• U.S. 40/East Washington Street, in both directions, between Washington Square Mall and the eastern edge of Cumberland may have the right lane closed as pipe work occurs in the area.
Date: Monday, March 1 – August 2010
Time: Continuous
E-MAIL TRAFFIC ALERTS
Traffic changes are expected as work on Project Open Market progresses. DPW encourages residents and motorists to sign up for e-mail traffic alerts at www.indy.gov/dpw/openmarket.
CENTER TOWNSHIP
TOTAL ROAD CLOSURE(S)
2026 West 44th Street
ROW10-03055
TOTAL ROAD CLOSURE OF 44th Street between Knollton and Cold Spring Road June 10, through September 16, 2010 for DPW PROJECT SS-24-001G.
DETOUR: West bound north on Cold Spring to Ayrshire north to 46th Street, west to Knollton south to 44th Street.
DETOUR: East bound north on Knollton to 46th, east to Ayrshire south to Cold Spring Road to 44th Street.
960 Bates Street***
ROW10-04926
TOTAL ROAD CLOSURE of Bates Street August 30, through
September 5, 2010.
WESTBOUND: North on Shelby, west on Georgia and south on Pine
EASTBOUND: North on Pine, east on Georgia, south on Shelby east on Bates
3020 Nowland Avenue
ROW10-02823
TOTAL ROAD CLOSURE of Nowland Avenue May 25,through
August 25, 2010 between Parker Avenue & Oakland Ave for water/main installation for Charter School.
EAST BOUND TRAFFIC to Dearborn Street, south to Nowland Avenue
WEST BOUND TRAFFIC to Dearborn Street, north to Brookside Pkwy S Drive, west to Parker Avenue
229 Shelby Street***
ROW10-04655
TOTAL ROAD CLOSURE of Shelby Street August 30, 2010 through September 5, 2010 for Rail Road repair.
SOUTHBOUND: East on Washington Street, south on State Street, west on English and south on Shelby Street
NORTHBOUND: East on English, north on State Street, west on Washington Street, and north on Shelby Street
1115 St Paul Street***
ROW10-04811
TOTAL ROAD CLOSURE OF St. Paul Street September 6, through September 10, 2010 for volunteer project for Southeastern Neighborhood Development.
SOUTHBOUND: St. Paul to Pleasant Run Pkwy to Churchman Avenue
3502 North White River PKWY WDR
ROW10-03048
TOTAL ROAD CLOSURE of White River PKWY WDR I-65 to 38th Street for DPW PROJECT SS-24-001G.
DETOUR: South bound west on 38th Street to Cold Spring south to 30th Street, east to White River PKWY WDR.
DETOUR: North bound west on 30th to Cold Spring north to 38th, east to Cold Spring Road.
Work to be completed September 16, 2010.
CENTER TOWNSHIP - TRAFFIC LANE(S)RESTRICTIONS
2018 East 10th Street
ROW10-03063
There will be 1 traffic lane restricted June 4, through
August 31, 2010 for main replacement.
2122 East 10th Street
ROW10-03064
There will be 1 traffic lane restricted June 4, through
August 31, 2010 for main replacement.
2236 East 10th Street
ROW10-03065
There will be 1 traffic lane restricted June 4, through
August 31, 2010 for main replacement.
1315 West 10th Street
ROW10-03672
There will be 1 traffic lane restricted June 28, through
August 31, 2010 for main repair.
500 West 21st
ROW10-04539
There will be 1 traffic lane restricted August 9, through
September 15, 2010 for basin replacement.
1525 South Belmont Avenue
ROW10-04472
There will be 1 traffic lane restricted August 4, through
September 4, 2010 for basin replacement.
100 South Capitol Avenue
ROW09-04731
There will be 2 traffic lanes restricted August 2, through October 30, 2010 for Convention Center Demo.
100 South Capitol Avenue
ROW10-01501
There will be 2 traffic lanes restricted April 7, through
October 7, 2010 for row excavation.
2802 North Capitol Avenue
ROW10-03733
There will be 1 traffic lane restricted July 1, through
September 1, 2010 for DPW PROJECTCS-18-072B.
2905 North Capitol Avenue
ROW10-04531
There will be 1 traffic lane restricted August 9, through
September 15, 2010 for row excavation.
2621 Central Avenue
ROW10-03739
There will be 1 traffic lane restricted July 1, through
September 1, 2010 for DPW PROJECT CS-18-072B.
1321 North College Avenue
ROW10-04900
There will be 1 traffic lane restricted August 18, through
September 22, 2010 for basin replaced.
300 East Fall Creek PKWY NDR
ROW10-03734
There will be 1 traffic lane restricted July 1, through
September 1, 2010 for DPW PROJECT CS-18-072B.
3602 Fall Creek PKWY NDR
ROW10-03737
There will be 1 traffic lane restricted July 1, through
September 1, 2010 for DPW PROJECT CS-18-072B.
30 West Georgia Street
ROW10-04931
There will be 1 traffic lane restricted August 23, through
November 1, 2010 for IPL lines re-locate.
126 West Georgia Street
ROW10-03686
There will be 1 traffic lane restricted June 29, through
August 29, 2010 for row excavation.
2822 North Illinois Street
ROW10-03732
There will be 1 traffic lane restricted July 1, through
September 1, 2010 for DPW PROJECT CS-18-072B.
2810 North Illinois Street
ROW10-04499
There will be 1 traffic lane restricted August 5, through
September 5, 2010 for basin replacement.
402 Kentucky Avenue
ROW10-02952
There will be 1 traffic lane restricted June 1, through
August 31, 2010 for main repair.
1004 South Keystone Avenue
ROW10-04413
There will be 1 traffic lane restricted August 4, through
August 31, 2010 for water repair.
11 East Market Street***
ROW10-04687
There will be 1 traffic lane restricted August 31, through
September 2, 2010 for brick repair.
1459 South Meridian Street
ROW10-03288
There will 1 traffic lane restricted June 14, through
August 31, 2010 for utility excavation.
534 East Michigan Street
ROW10-04435
There will be 1 traffic lane restricted August 3, through
September 3, 2010 for man hole replacement.
1740 West Michigan Street
ROW10-03730
There will be 1 traffic lane restricted July 1, through
September 1, 2010 for DPW PROJECT CS-18-072B.
3351 East Michigan Street
ROW10-04473
There will be 1 traffic lane restricted August 4, through
September 4, 2010 to replace basin.
526 East Morris Street
ROW10-02955
There will be 1 traffic lane restricted June 1, through
August 31, 2010 for service repair.
521 East North Street
ROW10-04464
There will be 1 traffic lane restricted August 4, through
September 4, 2010 for broken inlet.
2950 Prospect Street
ROW10-04888
There will be 1 traffic lane restricted August 18, through
September 22, 2010 for sewer replaced.
714 North Senate Avenue
ROW10-04441
There will be 1 traffic lane restricted August through
October 6, 2010 for boring.
1150 Shelby Street
ROW10-04420
There will be 1 traffic lane restricted August 3, through
September 15, 2010 to replace basin.
501 West Washington Street
ROW08-03280
There will be 4 traffic lanes restricted May 27, 2008 through January 1, 2011 for closure of sidewalk and one traffic lane on West Washington Street additional 2nd lane for approximately 10 weeks 6/19 to 8/28 and on West Street. Closure of 1 traffic lane on Maryland Street for construction of Marriott Hotel.
Traffic /Downtown Indianapolis
The Indianapolis Arts Garden features free performances all season. Visit www.DiscoverWholesaleDistrict.com for more information.
Log on to www.indydt.com/parkingdatabase.html before you come Downtown and find specific parking facility information, including photographs that will help you know what to look for.
Parking meters may also be available near your destination. They are FREE after 6 p.m. on weekdays and all day Saturday, Sunday and holidays.
DECATUR TOWNSHIP
TOTAL ROAD CLOSURE(S)
Bridgeport Road Bridge Over I-70 from Stafford Road to Stanley Road
8800W/5500S
Bridgeport Road Bridge over I-70 from Stafford Road to Stanley Road is closed indefinitely due to the I-70 reconstruction project.
Epler Road from Raceway Road to Bridgeport Road
5500S/9300W
Epler Road from Raceway Road to Bridgeport Road is closed indefinitely due to the I-70 reconstruction project.
Hanna Avenue Bridge Over I-70 from Kollman Road to South Perimeter Road
4000S/6700W
Hanna Avenue Bridge over I-70 from Kollman Road to South Perimeter Road is closed indefinitely due to the I-70 reconstruction project.
Kollman Road (small area just south of I-70)
6700W/3640S
Kollman Road (small area just south of I-70) is closed indefinitely due to the I-70 reconstruction project.
Raceway Road from 1075 East to Epler Road
9300W/5500S
Raceway Road from 1075 East to Epler Road is closed indefinitely due to the I-70 reconstruction project.
Scott Road from South of I-70 to Hanna Avenue
7000W/4000S
Scott Road from South of I-70 to Hanna Avenue is closed indefinitely due to the I-70 reconstruction project.
Stanley Road from Bridgeport Road to Brushwood Road
8800W/6500S
Stanley Road from Bridgeport Road to Brushwood Road is closed indefinitely due to the I-70 reconstruction project.
Thompson Road from Stanley Road to Brushwood Road
5000S/8800W
Thompson Road from Stanley Road to Brushwood Road is closed indefinitely due to the I-70 reconstruction project.
DECATUR TOWNSHIP
TRAFFIC LANE RESTRICTIONS(S)
5101 South High School Road
ROW10-03341
There will be 1 traffic lane restricted June 16, through
August 31, 2010 for row excavation.
FRANLKIN TOWNSHIP
TOTAL ROAD CLOSURE(S)
FRANKLIN TOWNSHIP
TRAFFIC LANE(S)RESTRICTION
LAWRENCE TOWNSHIP
TOTAL ROAD CLOSURE(S)
LAWRENCE TOWNSHIP
TRAFFIC LANE RESTRICTION(S)
8103 East 46th Street
ROW10-03584
There will be 1 traffic lane restricted June 24, through
August 31, 2010 for utility excavation.
7525 East 82nd Street
ROW10-02939
There will be 1 traffic lane restricted June 1, through
September 1, 2010 for excavating for fiber optics install.
8900 East 82nd Street
ROW10-04893
There will be 1 traffic lane restricted August 18, through
September 22, 2010 for inlet repair.
7734 Fall Creek Road
ROW10-03513
There will be 2 traffic lanes restricted June 22, through
December 31, 2010 for DPW PROJECT RESURFACING.
6820 Hague Road
ROW10-03514
There will be 2 traffic lanes restricted June 22, through
December 31, 2010 for DPW PROJECT RESURFACING.
PERRY TOWNSHIP
TOTAL ROAD CLOSURE(S)
748 West Hanna Avenue
ROW10-04548
TOTAL ROAD CLOSURE of Hanna Avenue between Division & Meridian Street September 1, through October 29, 2010 for Troy/Brill Sanitary Sewer Project #BL-32-001.
DETOUR ROUTE: North on Harding Street to Troy Avenue, east to South Meridian Street, north on South Harding Street to Troy Avenue, east to South Meridian Street.
3645 South Meridian Street
ROW10-01618
TOTAL ROAD CLOSURE of Meridian Street from Raymond St to Hanna Avenue. July 6, through August 31, 2010
for DPW PROJECT #BL-32-001 (Sewer Installation)
DETOUR NORTH: West on Hanna to Bluff, north to Raymond, east to Meridian
DETOUR SOUTH: West on Raymond to Bluff, south to Hanna east to Meridian
Sumner and Troy intersections to remain open
4201 South Sherman Drive
ROW10-01090
TOTAL ROAD CLOSURE of Sherman Drive March 15, through October 18, 2010 for Deck Replacement INDOT BRIDGE PROJECT #B-28915.
DETOUR: South bound west on Hanna to Keystone, south to Thompson, east to Sherman Drive.
DETOUR: North bound west on Thompson to Keystone,
north to Hanna, east to Sherman Drive.
PERRY TOWNSHIP
TRAFFIC LANE(S) RESTRICTION
1798 East Hanna Avenue
ROW10-00786
There will be 1 traffic lane restricted February 25, through December 31, 2010 for PROJECT STP-9949(093) DES#9981090 to relocate water main on Hanna & State.
8915 Madison Avenue
ROW10-04902
There will be 1 traffic lane restricted August 18, through September 22, 2010 for sewer repair.
1280 West Southport Road
ROW10-04273
There will be 4 traffic lanes restricted July 27, through
September 30, 2010 for gas main repair.
PIKE TOWNSHIP
TOTAL ROAD CLOSURE(S)
PIKE TOWNSHIP
TRAFFIC LANE RESTRICTION(S)
3350 West 38th Street
ROW10-03179
There will be 5 traffic lanes restricted June 14, through
August 31, 2010 for median removal/shoulder work for
INDOT/DPW PROJECT ST-16-067.
3950 North High School Road
ROW10-03237
There will be 3 traffic lanes restricted June 14, through
August 31, 2010 for median removal/shoulder work for
INDOT/DPW PROJECT ST-16-067.
3902 Georgetown Road
ROW10-03243
There will be 3 traffic lanes restricted June 14, through
August 31, 2010 for median removal/shoulder work for
INDOT/DPW PROJECT ST-16-067.
3898 Lafayette Road
ROW10-03244
There will be 3 traffic lanes restricted June 14, through
August 31, 2010 for median removal/shoulder work for
INDOT/DPW PROJECT ST-16-067.
3902 Moller Road
ROW10-03239
There will be 3 traffic lanes restricted June 14, through
August 31, 2010 for median removal/shoulder work for
INDOT/DPW PROJECT ST-16-067.
WARREN TOWNSHIP
TOTAL ROAD CLOSURE(S)
25 South German Church Road
ROW10-03898
TOTAL ROAD CLOSURE of German Church Road July 30, through August 27, 2010, from German Church Road from Washington Street south to Prospect Street for paving.
DETOUR: South bound traffic take Washington Street to
Mitthoeffer Road south to Prospect Street east.
DETOUR: North bound traffic take Prospect Street west to
Mitthoeffer Road north to Washington Street east.
WARREN TOWNSHIP
TRAFFIC LANE(S) RESTRICTION
5450 East 10th Street
ROW10-03617
There will be 1 traffic lane restricted June 25, through
August 31, 2010 for utility excavation.
3217 West 10th Street
ROW10-03690
There will be 1 traffic lane restricted June 29, through
August 31, 2010 for utility excavation.
302 South Post Road
ROW10-03462
There will be 1 traffic lane restricted June 21, through
August 31, 2010 for utility excavation.
402 South Post Road
ROW10-03463
There will be 1 traffic lane restricted June 21, through
August 31, 2010 for utility excavation.
450 South Post Road
ROW10-03464
There will be 1 traffic lane restricted June 21, through
August 31, 2010 for utility excavation.
8218 Rawles Avenue
ROW10-04013
There will be 1 traffic lane restricted July 17, through
September 19, 2010 for pipe installation.
8960 Rawles Avenue
ROW10-03465
There will be 1 traffic lane restricted June 21, through
August 31, 2010 for utility excavation.
9150 Rawles Avenue
ROW10-03453
There will be 1 traffic lane restricted June 21, through
August 31, 2010 for utility excavation.
7202 East Washington Street
ROW10-04118
There will be 1 traffic lane restricted July 20, through
September 30, 2010 for system improvement.
WASHINGTON TOWNSHIP
TOTAL ROAD CLOSURE(S)
2834 East 65th Street***
ROW10-04845
TOTAL ROAD CLOSURE of 65th Street September 1, through
October 29, 2010 for ditching on northside ditchline from Oxford Street west
EASTBOUND: 65th Street traffic go south on Keystone Avenue to 62nd Street, then east on 62nd to Dean Road, then north on Dean Road back to 65th Street
WESTBOUND: 65th Street traffic do the opposite
6255 North Tuxedo Street***
ROW10-04850
TOTAL ROAD CLOSURE of Tuxedo September 8, through
October 14, 2010 for ditching on both sides of Tuxedo from 65th Street south to 62nd Street
SOUTHBOUND: Tuxedo traffic to go west on 65th Street, to Oakland Avenue, south on Oakland to 62nd Street, then east back to Tuxedo Street
NORTHBOUND: Tuxedo traffic do the opposite
4390 Cold Spring Road
ROW10-03552
TOTAL ROAD CLOSURE of White River PKWY WDR/Cold Spring Road from 38th street to 44th Street
DPW PROJECT SS-24-001G.
June 28, through November 16, 2010
DETOUR ROUTE: North bound White River PKWY WDR west on 30th Street to Kessler Blvd NDR, north to 44th Street, east to Cold Springs Road
DETOUR ROUTE: South bound Cold Spring Road west on 44th to Kessler BLVD NDR south to 30th, east to White River PKWY WDR.
WASHINGTON TOWNSHIP
TRAFFIC LANE(S) RESTRICTION
710 East 52nd Street
ROW10-03742
There will be 4 traffic lanes restricted June 3, through
September 30, 2010 for DPW PROJECT #RS-10-052.
(RESURFACING).
3630 East 61st Street
ROW10-03739
There will be 1 traffic lane restricted June 3, through
September 30, 2010 for DPW PROJECT #RS-10052.
(RESURFACING)
6945 North College Avenue
ROW10-03147
There will be 1 traffic lane restricted June 14, through
November 15, 2010 for water main installed.
WAYNE TOWNSHIP
TOTAL ROAD CLOSURES
2950 Cold Spring Road
ROW10-04124
TOTAL ROAD CLOSURE of old Spring Rd. August 9, through
October 30, 2010 for DPW PROJECT #SS-24-00G1 (NORTH BELMONT RELIEF INTERCEPOR SECTION #3) Installation of Sanitary Sewer Main along Cold Spring Road
DETOUR NORTHBOUND: Cold Spring Rd north on Lafayette Road to north on Kessler Blvd, east on 30th Street
DETOUR SOUTHBOUND: Cold Spring Rd west on 30th Street, south on Kessler Blvd, south on Lafayette Road.
WAYNE TOWNSHIP
TRAFFIC LANE(S) RESTRICTIONS
3225 West 10th Street
ROW10-04904
There will be 1 traffic lane restricted August 18, through
September 22, 2010 for lead pipe repair.
3051 West 16th Street
ROW10-04488
There will be 1 traffic lane restricted August 4, through
September 30, 2010 service leak repair.
4809 West 38th Street
ROW10-03199
There will be 5 traffic lanes restricted June 14, through
August 31, 2010 for median removal/shoulder work for
INDOT/DPW PROJECT ST-16-067.
5501 West 38th Street
ROW10-03234
There will be 5 traffic lanes restricted June 14, through
August 31, 2010 for median removal/shoulder work for
INDOT/DPW PROJECT ST-16-067.
6931 West Morris Street
ROW10-04173
There will be 1 traffic lane restricted July 26, through
September 30, 2010 for water valve replacement.
113 North Raceway Road
ROW10-02956
There will be 1 traffic lane restricted June 1, through
August 31, 2010 for main repair.(must work around event)
If you would like to receive weekly traffic e-mail updates, visit www.indygov.org and register for our Street Closing and Traffic Restrictions e-newsletter. For information about other Indianapolis Department of Public Works services, please visit the DPW Web site at www.indy.gov/dpw.
For information on Indiana Department of Transportation projects, state roads and highway information, please contact INDOT at 232-5533.